Factory

One workshop, start to finish

We have been making stainless steel tableware in Jieyang since 2006. Pressing, welding, polishing and assembly happen in the same building, which is the main reason we can hold tolerances and lead times on private-label orders. factory direct · no middlemen · OEM/ODM welcome.

Inside the workshop

A short walkthrough of the line. Self-hosted and muted by default — open it in full screen to hear the shop floor.

Press shop, polishing and assembly — Jieyang, Guangdong.

Established

2006

Site area

16,700 m²

Workshop

7,000 m²

Production equipment

91 machines

Capacity

3,000,000 pcs / month (expandable to 5,000,000 pcs)

Certification

ISO 9001:2015

Factory audit

TÜV Rheinland factory audit passed (Jan 2026)

Location

Jieyang, Guangdong, China

500 new developments per year · nearest port: Shenzhen. Capacity figures cover the whole tableware line — measuring spoons and cutlery combined. Selected products certified (LFGB / CE); certificates provided on request.

Process

Chaodeli production process — forming, joining, finishing, marking, inspection, packing

1 · Product Design

2 · Mold Opening

3 · Material Checking

4 · Material Cutting

5 · Rolling

6 · Stamping

7 · Fine Polishing

8 · Cleaning and Drying

9 · QC and Packing

10 · Lab Testing

11 · Shipping